If the work done in increasing the velocity of a body by 25% is 900 J, then the work done in decreasing the velocity of the same body by 25% is
- (1)
700 J
- (2)
500 J
- (3)
225 J
- (4)
450 J
Show answer
Option (1) is correct.
The council's preliminary key
If the work done in increasing the velocity of a body by 25% is 900 J, then the work done in decreasing the velocity of the same body by 25% is
700 J
500 J
225 J
450 J
Option (1) is correct.
The council's preliminary key
The worked solution is in the EdLoop app, free on Android, with every other Work, Energy & Power question from 2010 to 2026.
Physics Work, Energy & Power question from AP EAPCET 2026 (12th May 2026 Shift 2) (AP EAPCET exam). This is the paper as APSCHE held it.