When the load applied to a wire is increased from 5 kg wt to 8 kg wt, the elongation of the wire increases from 1 mm to 1.8 mm. The work done during the elongation of the wire is (Acceleration due to gravity = $10\ \mathrm{ms^{-2}}$)
- (1)
$47 \times 10^{-3}\ \mathrm{J}$
- (2)
$72 \times 10^{-3}\ \mathrm{J}$
- (3)
$25 \times 10^{-3}\ \mathrm{J}$
- (4)
$97 \times 10^{-3}\ \mathrm{J}$
Show answer
Option (1) is correct.
The council's preliminary key